ABOUT
Our Story
Our Story
Discover our story – and find out how we became one of the world's most trusted makers of protective transportation and storage products.
How We Can Help
How We Can Help
For over 50 years, we’ve been keeping equipment safe on the road for all kinds of businesses. Discover how we can help your business.
PRODUCTS
Rackmount Transit Cases
Rackmount Transit Cases
Rotational Molded Cases
Rotational Molded Cases
Aluminum Cases
Aluminum Cases
Air Conditioned Transit Cases
Air Conditioned Transit Cases
CP Cases has been considered the industry leader in Air-Conditioned Transit Cases (AC/TC), since their initial development in 2005. We offer air conditioning options for our Amazon Racks, as well as all 4U and larger ERacks. Air conditioning can be provided using either a Thermoelectric (TEU) or a Vapor Compression Cycle (VCC) unit. The size and type of AC unit is selected based on the cooling output required to keep the electronics operating in the optimal environment. The cooling required is dependent on various factors like heat output of the electronics and geographic location of use. Many of our air-conditioned transit cases utilize an extra, smaller case called a COOL COLLAR to permanently house the ac unit. This allows the operator to connect the cases during operation and disconnect them for storage and transport. It also gives users access to the rear of their electronics without depopulating the chassis.
Injection Molded Cases
Injection Molded Cases
The 3i Series Cases are injection molded from ultra high-strength polypropylene copolymer resin, material specified by the U.S. military for cases and containers. It features a gasketed, water and dust-tight submersible design, meeting military standard MIL-C-4150J.
Rugged Textiles
Rugged Textiles
Custom Flight Cases
Custom Flight Cases
A long-lasting, custom flight case solution for multiple trips with heavy payloads. Our Flight Cases draw on over 50 years of case making experience to provide a long-lasting, rugged transport or storage solutions.
MARKETS
CUSTOMIZATION
RESOURCE CENTER
CONTACT
Quadratec Limited is an advanced technology company involved in the design, development and manufacture of engineering products, instrumentation, machines and test equipment offering a unique blend of advanced technology engineering across a broad range of industries. The company has built a significant track record of providing highly competent technical solutions to complex problems across sophisticated niche markets.
Quadratec Ltd was tasked with producing a fully packaged bespoke solution to replace the existing deployable data and communications system used by UK MOD and military forces on operational deployment.
Comprising of a communications hub, display screens, telecoms equipment and data encryptors, the system was a secure field-office, with the capability to receive, utilise and transmit encoded data, in an array of formats; voice, visual and data. The units needed to be packaged in robust containers, each of the same size and as compact as possible, and to facilitate quick deployment and storage.
CP Cases treated this job as a UOR (Urgent Operational Requirement), and set about customising its Amazon Case format to fit this requirement. The only constraints were existing equipment dimensions (data encryptors, display screens, ancillary equipment such as telephones, etc).
As always CP Cases worked very closely with the system designers and engineers from Quadratec to ensure that all aspects of the requirement were addressed and considered early in the process to mitigate issues and problems that might be encountered, enabling the entire system to be packaged in three Amazon format cases.
All Amazon Cases are produced using a process called rotational moulding. It’s ideal for making tough, waterproof cases, using a high quality polymer that thickens at the edges and corners for extra strength and impact resistance. Custom designed foam inserts were produced to protect the individual components during the arduous rigours of deployment to, and use in ,operational theatres.
The initial requirement of seven sets of three boxes were delivered within 3 months of the preliminary inquiry, which included incorporating a revised communications hub once over 80% of the task was complete.